Following successful works at their site in Birmingham, they contacted Power Efficient Solutions to carry out an assessment of the electrical efficiency at their site in Halesowen.
After assessing the client’s data, we identified a poor power factor of 0.74 (lag) or 74% efficient and followed up with a site survey. During the survey we carried out supply analysis across a 7-day period and recommended a 300kVAr standard PFC unit be installed, to improve electrical efficiency, reduce amps at the main incoming switch (for future expansion plans) and realise the annual savings detailed above.
The installation was carried out across 2-days during normal working hours, with no disruption to the clients’ normal operations.
Annual Savings
- £7,741.88
- 18,038 kWh (Client)
- 16,667 kWh (DNO)
- 15,548 Kg Co2 (Carbon Dioxide)
- 322 Kg So2 (Sulphur Dioxide)
- 61 Kg NOx (Nitrogen Oxide)
- 2.8 Acres of Trees
Payback & Benefits
- 15 Months
- Reductions in energy costs (kWh)
- Reduction in Amps – 221 Amps per phase
- Compliance with legislation
- Improved efficiency
- Reduction in excess ASC charges
- Removal of Reactive Power Charges