Instarmac – 768kWp Commercial Solar PV Case Study

Instarmac Commercial Solar PV Installation

Project At A Glance

  • Client: Instarmac Group plc
  • System Capacity: 768 kWp Commercial Solar PV
  • Year 1 Energy Output: 667,000+ kWh
  • First-Year Financial Savings: £125,518
  • Estimated Payback Period: ~4 Years
  • Primary Objectives: Operational energy cost reduction, carbon footprint mitigation & long-term sustainability

The Background & Operational Challenge

Instarmac Group plc is a multi-award-winning, market-leading specialist in the research, development, and production of high-specification materials for highway maintenance, urban regeneration, commercial tiling, and flooring sectors. Operating extensive manufacturing and processing facilities, the business demands high daily energy consumption to power its production lines and distribution hubs.

With volatile energy costs and ambitious sustainability targets across their operations, Instarmac sought an industrial-grade energy solution to reduce utility expenses, lower carbon emissions, and increase energy independence without disrupting ongoing manufacturing operations.

The Engineering & Solar PV Solution

Working alongside specialist delivery partners, PES UK specified and engineered a bespoke 768kWp commercial roof-mounted solar PV system tailored specifically to match Instarmac’s baseline power requirements.

The system was designed to maximize daytime solar harvest, feeding clean energy directly into the site’s main distribution networks. High-efficiency tier-1 solar panels and commercial-grade inverters were deployed alongside robust mounting systems to withstand long-term operational exposure while adhering to strict structural safety standards.

Results, Performance & Environmental Impact

In its first 12 months of operation, the 768kWp solar array met all key generation targets, producing over 667,000 kWh of zero-carbon power directly on site. Key project results include:

  • £125,518 First-Year Savings: Direct, immediate reduction in daytime grid electricity charges.
  • 4-Year Payback Period: Rapid ROI with years of localised, low-cost power generation remaining on system lifespan.
  • Carbon Offset: Significant decrease in Scope 2 emissions, strengthening Instarmac’s corporate environmental commitments.
  • Tariff Protection: Greater independence from grid volatility and future power price spikes.

Explore Commercial Energy Solutions

PES UK provides turnkey energy reduction systems for manufacturing and commercial facilities across the UK. Discover how our Power Factor Correction solutions and bespoke commercial solar installations can lower operational costs for your business, or get in touch with our engineering team today.

Instarmac